Текст страницы
Installation Diagram of HD Network Zoom IR Dome Camera-V3.0peaker
Steps:
1. Paste the positioning stickers on the wall.
2. Make holes on the marked positions using an electric drill.
3. Drive the expansion rubber plug into the hole.
4. Fasten the base of camera to the wall with screws.
5. Rotate the lens to the target angle.
6. Before installing the equipment in a humid environment, please replace the desiccant and then
fasten the dome housing to the base of dome, and finally remove the protective film on the housing
(Note: do not crimp when installing dome housing on the base).
Note:
(1) The mounting surface of camera must have sufficient bearing capacity.
(2) Fog may be caused when disassembling the equipment in wet environments.
(3) To ensure the waterproof effect, please tighten the screws.
34