Инструкция вентилятор Beko EFW 6900 B

3 Installation (стр. 9 из 142)

Бренд: Beko

Страница 9 документа Вентилятор Beko EFW 6900 B. Раздел: Вентиляторы. Бренд: Beko.

Текст страницы

3 Installation

3.1 Assembly

1. Do not operate the tower fan without

the base. The tower fan base is com­
posed of two pieces (BASE FRONT and
BASE BACK). The base needs to be
connected together prior to attaching
it to the tower fan. Align, and then in­
sert, the plastic pegs of the BASE BACK
with the holes on the BASE FRONT un­
til both pieces snap together.

Base back

Base front

2. Now that the base is connected to­

gether, find the plastic nut that is in­
stalled on the bottom of the fan body.
Take out the plastic nut by rotating it
counter-clockwise. Thread the tower
fan’s power cord through the hole in
the middle of the base.

9 / EN
Tower Fan / User Manual

Бытовая техника / Техника для дома / Летний климат / Вентиляторы

Aceline SFJX-1643

12 стр.
Бытовая техника / Техника для дома / Летний климат / Вентиляторы

Aceline SFJX-1643

12 стр.
Бытовая техника / Техника для дома / Летний климат / Вентиляторы

Aceline TFJX-1243

12 стр.
Бытовая техника / Техника для дома / Летний климат / Вентиляторы

Aceline TFJX-1243

12 стр.
Бытовая техника / Техника для дома / Летний климат / Вентиляторы

Brayer 4957BR

44 стр.