Текст страницы
2.2 Installation of the mount on a loadbearing wall, not
aerated concrete (plaster thickness no more than 40 mm)
•
Put the drilling template (L) to the wall, mark drilling spots.
L
•
Drill holes using a Ø 10 mm (3/8") bit at
depth minimum 3.54” (90mm).
90 mm
(3.54")
Put the mount to the wall the way,
that mounting slots are located at
the bottom.
•
Insert dowels (I) into the holes. Make sure that dowels are
completely in the wall. Tap them with a hammer.
•
Install the mount on the wall using screws М7х80 (Н).
I
H
The bottom
of the bracket
Қазақ
Русский
Español
Italiano
Français
Deutsche
English
IMPORTANT: Do not use the wrench (G) from the kit!
G
6