Текст страницы
3 Installation Instructions
3.1 Preparation for Installation
(1) Basic requirements
Ensure that all electrical work must be conducted in accordance with the latest electrical
regulations, fire regulations and related regulations; check whether the packaging is damaged,
equipment and accessories are complete, and determine whether the application places and
installation methods of network camera product meet the requirements; please contact the dealer if
necessary, please use the product according to the requirements of the working environment.
(2) Common installation tools:
Prepare the tools actually required according to the actual situations
Common installation tools
(3) Check the strength of the construction of installation space and installation site
Confirm that there is enough space at the installation site to accommodate the product and its
mounting structural part. Confirm that the carrying capacity of the ceiling, wall and bracket on which
the network camera is installed must be able to support the total weight of network camera and its
mounting structural part, with a 4 times of safety factor.
Please keep all packaging materials of network camera
After unpacking the network camera, please keep the original packaging materials of network
21