Текст страницы
2.5.5
Main Board
Tool Preparation: No. 3(Refer to Maintenance Tool List)
(1). Remove the Front Cover, and Drum Unit, Paper Tray, Right Cover.
(2). Remove all cables including the FFC cables (total: 12).
(4). Remove TS3X8 screws x 2 and TS3X10 x 2 to remove the main board.
HV&LV Power supply
(20P)
IFA97&LPH
UIA188
Micro Switch(2P)
Exit Sensor(3P)
IFA99
Main Motor(4P)
Rear door open
Sensor(3P)
Thermistor(4P)
Wifi Dongle or CSA6
Fan(3P)
PC
PC
ABA85(8P)
IFA98
50
Confidential